AI-Powered Construction Intelligence
Every spec. Every detail. Extracted instantly.
Upload your construction documents and get structured, searchable project intelligence. Contracts, drawings, spec books, and schedules — extracted and organized automatically.
Start a ProjectEquipment Schedule
Flagged Items
Duct insulation spec?
1" fiberglass on supply, 1/2" on return per Spec 23 07 13
The Problem
Construction docs are a mess
Scope exclusions buried on page 47
Critical exclusions hiding in spec books cost you money. "Furnished by others" means a change order waiting to happen.
Hours spent building equipment lists
Manually typing schedules from drawings into spreadsheets. Copy-paste errors. Missing items discovered during install.
"What insulation spec did they call for?"
Flipping through 200 pages to find one detail. Information scattered across drawings, specs, and schedules.
What It Does
Three ways Deadband saves you time
Equipment schedules in one click
Upload drawings and get structured equipment lists with manufacturers, models, capacities, and electrical requirements. No more manual transcription.
- Air handling units
- Fan coil units & terminal boxes
- Pumps & chillers
- Unit heaters & CRACs
Extracted from M-101 Equipment Schedule
Catch scope gaps before they cost you
AI reads every page and flags exclusions, split responsibilities, and coordination risks. See what's missing from your scope.
- Scope exclusions flagged
- Owner-furnished items
- Coordination requirements
- RFI suggestions
Controls furnished by owner
Page 23: "BAS controls furnished by Division 25"
Fume hood exhaust excluded
Spec 23 05 00: "Lab exhaust by lab equipment vendor"
Roof curbs by others
Drawing M-401: "Curbs by roofing contractor"
Equipment color TBD
Spec 23 05 00: "Color to be selected by architect"
Chat with your documents
Ask questions in plain English. "What's the duct insulation spec?" Get instant answers with page references.
- Natural language queries
- Source citations
- Cross-reference specs & drawings
- Instant answers
What insulation is required for chilled water piping?
Chilled water piping requires:
- • 1" fiberglass with vapor barrier (pipes up to 4")
- • 1.5" fiberglass with vapor barrier (pipes 5" and above)
- • All fittings and valves to be insulated to match
Source: Spec 23 07 00, Section 3.2
Who It's For
Built for mechanical contractors
Estimators
Bid faster, miss less
Extract equipment lists and specs in minutes instead of hours. Catch scope exclusions before they become change orders.
10x
faster takeoffs
Project Managers
Know your scope cold
Instant answers to field questions. Track submittals against specs. Flag coordination issues before they hit the schedule.
100%
searchable docs
Field Teams
Specs at your fingertips
Ask "What's the pipe insulation for chilled water?" and get the answer with the spec section. No more flipping through binders.
< 30s
to any answer
Ready to see your project clearly?
Upload your first set of documents and get structured insights in minutes.
Get Started Free